Vtiger CRM - Implementation Checklist
From vtiger.com
(Contributed By: dcha in vtiger General Discussions)
Quick Reference
- Release Notes
- vtiger CRM - How To's
- vtiger CRM - Installation Manual
- vtiger CRM - User Manual
- vtiger Outlook Plug-in User Guide
- vtiger Office Plug-in User Guide
- vtiger Thunderbird Extension User Guide
- vtiger Customer Portal User Guide
- vtiger CRM - Implementation Checklist
- vtiger CRM - Database Migration Procedure
Contents |
[edit] Identify CRM Goals
These will lead to knowing which modules and configurations will be needed for vTiger. A broad distinction of the intended implementations would be:
- Sales oriented
- Support oriented
- Order Management oriented
[edit] How will CRM success be measured?
The following basic Key Performance Indicators should be taken into consideration, a standard before/after comparison should be conducted based on historical data of at least 3 months past; 1 year historical data would be best to perform an overlay due to the matching of "high/low" sales seasons.
- Information Structure
Document the present number of manhours required to obtain a client file (which includes their contact details, project(s) or sales volume status, etc).
- Sales Volume
Document the frequency and volume of which clients purchase from you annually.
- Client Satisfaction
Document the number of complaints, follow-up trips and other "out-of-sales-cycle" events.
By obtaining the abovementioned basic 3 facts, a quick bird's eye view can be seen on the increase/decrease in effectiveness of the sales team.
[above contributed by Nicholas Chan, iFoundries]
Identify the ways the pilot will be a success and knowing that we should move to a full scale deployment. How will the overall project and implementation be measured for success?
[edit] Determine Business Needs
- Determine initial pilot users
- Determine business sales, marketing, and customer service processes that will be addressed by the system
- Determine language(s) for the UI.
- Start with just a few processes and get them running well in vTiger. Expand from there.
- Identify the training needs
- Document processes and workflows for users (i.e. entry of accounts, entries of activities, assignment of potentials)
- Develop training materials and plan
[edit] Determine Data Needs
- Determine the various file imports, exports, and data integration that is needed
- Prepare file imports (if necessary)
[edit] Determine Company specific customizations
- Determine if terms, forms, etc will need to be changed to accommodate specific industry or company specific requirements
- Review vTiger with core business users
- Determine whether certain customizations are required for localization purposes (i.e. accomodate certain business practices or legal requirements)
[edit] Prepare Technical Infrastructure
- Establish server, OS, etc.
- Pre-install considerations
a. Will vtiger run on a local server or from a hosting company? (fastCGI/CGI support, connection speed, hosting shared server load all affect page loading times)
b. How users are expected to use this install?
(if many users, need to decide roles - and set up user groups)
c. What OS is it running on - Linux/*Nix/Windows?
d. Back end database - MySQL/PostgreSQL/other?
e. Is Apache/PHP/*SQL already installed? What versions and what is the configuration?
(vtiger needs certain settings - can these be tweaked by an .ini file?)
It is necessary to know what changes (if any) will be necessary for a smooth vTiger install. Much time is saved getting this set up correctly up front.
2.
Windows
- Download installs and patches
[edit] Install vTiger
- Install release and patches
- Install windows services
- Configure backup of vTiger in DB utilities
- Install as a service and start when Windows starts